National Audit Office Press Releases
Printable version

Army 2020

Full report: Army 2020

The decision by the MOD to implement Army 2020, its programme to reduce the size of the regular Army and increase the number of trained Army reserves, was taken without appropriate testing of feasibility, according to the National Audit Office.

In its report to Parliament, the spending watchdog warns that transition to the new Army structure comes with significant risks which, if they materialized, could significantly affect the Army’s ability to achieve its objectives and value for money.

Under Army 2020, by December 2018 the number of trained regular soldiers in the Army needs to be reduced by around 20,000 (down from 102,000); and, by the end of 2018-19, the number of trained reserve soldiers needs to be increased by at least 11,000 (up from around 19,000). The Department considers that this reduction in size of the Army will help the Army achieve savings of £10.6 billion over 10 years to 2021-22. The resulting Army would consist of 82,500 regulars and 30,000 trained reserves. However, the Department did not test whether it was feasible to recruit and train the required number of reserves by 2018-19.

There has not been a significant growth in the overall trained strength of the Army reserve in the last two years. At April 2012, the trained strength was 19,410. In April 2014 it was 19,400. In 2013-14, a total of 3,020 soldiers entered the Army Reserve.Reserve recruitment targets increase substantially over the next five years. For example, in 2016-17, the Army will need to recruit 9,270 reserves, including 8,000 new recruits. A significant change in performance is therefore required, particularly for new reserves, if the Army 2020 structure is to be staffed in time.

The Army is ahead of target in its planned reduction of the Regular Army to 82,500 soldiers. (As at April 2014, its trained strength was 87,180). However, recruitment of new regular soldiers was behind schedule in 2013-14. The Army recruited 6,366 regular soldiers against a target of 9,715 (a shortfall of 34 per cent).

The Army’s recruitment contract with Capita has been subject to a number of difficulties that have affected recruitment performance, including the MOD’s failure to provide ICT infrastructure critical to the success of the project.This means poor recruitment performance cannot be distinguished from the impact of ICT failings.

The Army has not publicly detailed what aspects of the transition to Army 2020 it needs to achieve by when for it to operate effectively. This makes it difficult to measure progress towards full implementation. The Army has also not set clear trigger points for enacting any contingency plans. For example, if the reserve recruitment shortfall persists, there is a risk of staffing gaps in some parts of the Army structure and increased pressure on regular units.

Other risks include the significant challenge faced by the Army in implementing Army 2020 alongside other substantial ‘change programmes’, such as a new Army basing programme including the return of UK troops from Germany. Army 2020 also seeks, for the first time, to integrate regulars and reserves fully within a single force structure. However, 65 per cent of regular Army respondents to a 2014 MOD survey believe that regular and reserve forces are not well integrated. In addition, achieving the aims of Army 2020 requires additional funding for equipment which is not yet guaranteed.

 

"Army 2020 requires an overall reduction in the size of the Army and a fundamental change to its composition, with a significant reduction in the number of regulars and a substantial increase in the number of trained reserves. Military judgement played an important role in decisions but committing to moving towards an Army structure with fewer regular soldiers and an increased number of reserves within the planned timescale should have been subject to more rigorous testing of feasibility. The Department and Army must get a better understanding of significant risks to Army 2020 – notably, the extent to which it is dependent on other major programmes and the risk that the shortfall in recruitment of new reserves will up the pressure on regular units."

Amyas Morse, head of the National Audit Office, 11 June 2014

Notes for Editors

82,500

Trained regular Army personnel planned in December 2018

30,000

Trained Army reserves planned by the end of the financial year, 2018-19

£10.6bn

Total reduction in the Army's budget between 2011-12 and 2021-22 102,000 to 82,500

20,000

Planned reduction in regular Army numbers, down from 102,000, by December 2018

7,947

Army personnel selected for redundancy between 2011 and May 2014

11,000

Minimum increase in trained Army reserves, from 19,000, needed by end of 2018-19

1,975

Reserve soldiers recruited by Capita in 2013-14 against a December 2012 Army Demand Plan requirement of 6,000

3,184

Regular Army training places unfilled in 2013-14, from a planned allocation of 9,382 places

1. Press notices and reports are available from the date of publication on the NAO website, which is at www.nao.org.uk. Hard copies can be obtained by using the relevant links on our website.

2. The National Audit Office scrutinises public spending for Parliament and is independent of government. The Comptroller and Auditor General (C&AG), Amyas Morse, is an Officer of the House of Commons and leads the NAO, which employs some 820 staff. The C&AG certifies the accounts of all government departments and many other public sector bodies. He has statutory authority to examine and report to Parliament on whether departments and the bodies they fund have used their resources efficiently, effectively, and with economy. Our studies evaluate the value for money of public spending, nationally and locally. Our recommendations and reports on good practice help government improve public services, and our work led to audited savings of almost £1.1 billion in 2013.

3. The Department projected that its 2011 decision to further reduce the size of the Army to 82,000 would enable the Army to achieve staffing savings of £5.3 billion over the ten years from 2012-13 to 2021-22. These savings were in addition to £5.3 billion of savings already identified by the Strategic Defence and Security Review, arising from reductions in manpower and equipment budgets. The Department therefore expected to make overall savings of £10.6 billion

Channel website: https://www.nao.org.uk/

Share this article

Latest News from
National Audit Office Press Releases

How Lambeth Council undertakes effective know your citizen (KYC) / ID checks to prevent fraud