back to listings SME Profile: Building Ventilation Solutions LTD (BVS)
|
Unit 23, Sandleheath Industrial Estate, Old Brickyard Road, Sandleheath, Fordingbridge, SP6 1PA T: 01256 518170 | E: info@bvs-ltd.co.uk | W: www.bvs-ltd.co.uk |
ABOUT US
Engineering-led for over 40 years.
BVS has been working in mechanical ventilation since the 1980s. We refurbish, upgrade, install, and maintain air handling units across the UK, for hospitals, hotels, schools, leisure centres, defence facilities, and retail estates. The engineering is consistent. The approach adapts to the environment.
WHAT WE DO
Air Handling Units, the Full Scope
We exist to solve problems with air handling equipment. That might be an AHU that is failing, one that is consuming more energy than it should, one that no longer meets compliance requirements, or one that simply needs replacing. We provide the full scope, from initial survey through to commissioning and handover.
The reason clients come back is straightforward: BVS manages the whole job. There is no disconnect between the surveyor who assessed the unit and the engineers who install it. The specification matches the site. The programme gets kept.
We work directly with estates managers, facilities teams, and end users, and equally with HVAC contractors, M&E consultants, and building services engineers who need a reliable delivery partner.
- Engineering Honest
We assess every unit on its own merits. If refurbishment is not the right answer, we say so. There is no commercial pressure to favour one route over another
-
One Team
Survey, specification, manufacture where required, installation, commissioning, managed by BVS from first visit to handover. One point of contact and one point of accountability throughout.
-
Programme Discipline
Healthcare estates, live hotels, academic windows, secure sites, we plan around the constraints that matter to our clients and we deliver to the agreed programme.
-
Direct & Responsive
Quick replies. We answer the phone. Whether you are an M&E contractor working to a programme or an estates manager dealing with an urgent failure, you speak to someone who knows the job.
OUR SERVICES
AHU specialists covering refurbishment, EC fan upgrades, coil replacement, new installation, controls, and decarbonisation support.
Not sure which service applies, or need something not listed here? Speak to our team →
|
Typical outcome Reduce fan energy use by 30–50% Retrofit EC fans into existing AHU casings without structural modification. Common indicators
|
![]() |
![]() |
Typical outcome Restore full heating and cooling performance On-site measurement and direct replacement of heating, cooling, or heat recovery coils. Common indicators
|
|
Extend asset life and reduce replacement cost
|
![]() |
![]() |
AHU Manufacturing & Installation Full scope from design to handover, under one contract
|
|
Restored control, fault logging, and remote monitoring
|
![]() |
![]() |
Planned and reactive cover under one specialist
|
ADDITIONAL SERVICES
|
Entire system condition assessment with a full documented report of findings and proposals, covering ductwork, coils, fans, controls, and insulation repair. |
Uneven airflow, pressure loss, or visible duct damage? We repair or replace ductwork sections to restore system performance. |
|
40+ years of AHU experience means we've seen it before. We diagnose the root cause and give you a clear, practical fix, from insulation repair to controls failures. |
Installation, maintenance, and repair of commercial pipework systems, HVAC circuits, heating mains, and associated insulation. |
INDUSTRIES
The engineering is consistent. The approach adapts. Healthcare means live clinical environments and careful documentation. Defence means security compliance and programme rigour. Education means the summer window. We've worked in all of them.
|
Active hospitals & Live clinical environments. |
Security cleared & Restricted access sites. |
Around term times & your budget |
|
Out-of-hours & Minimum disruption to operations. |
High-humidity & Corrosion-resistant spec. |
Around your trading hours & operational needs |










